See your all-in price in the configurator. Every price is confirmed after a free site evaluation. See how pricing works
Adam Mayberry, architectAaron Van Roo, general contractor

An architect and a general contractor.
One team, start to finish.

Your backyard ADU, designed and built by one team.

Permit-ready plans, architecture, permits and construction, handled by A Mayberry ADU from first sketch to move-in.

Powered by FutureLot: see what you can build and which plans fit.

All-inclusive

Architecture and engineering
City plan check and permit fees
Fixtures, finishes and appliances
Licensed, insured build team

The lineup

5 plans

360 to 1,200 sq ft · studio loft to 3 bedrooms

Compare plans

ADU configurator

Configure your ADU in about three minutes.

Start configuring

Pick a plan

Five pre-designed ADUs, each with permit-ready drawings.

What our permit labels mean

Permit Ready

The drawings are complete and ready to submit. Your city reviews your project through its standard permit process.

Permits Pending

We have submitted this plan to the city named on the label for pre-approval. The city has not approved it yet.

Pre-Permitted

The city named on the label has reviewed and pre-approved this plan. Your project still needs a site plan and a permit for your lot, and changes to the plan can move it to standard review.

City labels apply only to the plan and city shown. A plan with no label for your city goes through that city's standard permit process. Timing, fees and eligibility vary by city and lot, and we confirm your path at the site evaluation.

How it works

01

Check your lot

Most single-family lots support at least one ADU. Start with the lot search.

02

Configure

Choose a plan, roof and exterior materials, and an interior vibe.

03

Site evaluation

We walk your site, confirm your price and turn your selections into a contract.

04

Permit and build

Permits take a few weeks to 3 months depending on the city. Construction takes about 5 to 6 months.

Meet your architect and builder

More than 20 years each designing and building homes in Northern California.

Common questions

What does an ADU cost to build?

We confirm price after a site evaluation, because tree removal, landscape patching and utility hookups vary from lot to lot. The configurator gives you an all-in starting number.

How long do permits take?

From a few weeks to about 3 months, depending on the city. Construction takes about 5 to 6 months after that.

What does permit ready mean?

Permit ready means our drawings are complete and ready to submit to your city, which reviews your project through its standard permit process. Pre-permitted means a city has already reviewed and pre-approved a specific plan. Each plan shows its status by city.

What if I already have a builder?

We'll help you get the building permits, but we build every A Mayberry ADU ourselves. That's how we keep the quality consistent and stand behind it with our warranty after construction.

All 20 questions

From the blog

All posts

Ready to see what fits your lot?